Asset integrity should be defined at the Conceptual Design and further developed in Detail Design to produce an Asset Integrity System that can monitor and be implemented throughout the life of the life cycle of the delivered asset. We are able to review and provide comments on documents that you have prepared with the perspective of maintaining a positive outcome, managing client expectations whilst enhancing your ability to maintain cost control to an achievable scheduled delivery.
Please call or email with your enquiry
Tel: 0203 303 0978
Email: info@deter.org.uk